BLOG

OE PHOTONICS Hanging On Production and Epidemic Prevention

27th Feb. 2020 is the 7th day that OE Photonics resumes production. Production is going on intensely. At the same time, we are not relaxed about epidemic prevention.

Feb 27,2020

27th Feb. 2020 is the 7th day that OE Photonics resumes production. Production is going on intensely. At the same time, we are not relaxed about epidemic prevention.

Daily disinfection throughout the whole company, and continuous temperature measurement by all staff

 

OE

OE

 

We believe that we will win this "battle"! 

keywords: resumes,production